20 OCTGSTR-3B · Summary return · Sep 2026in 3 days 21 OCTTax Audit Report · Form 3CA/3CB · AY 2026-27 · extended from 30 Sepin 4 days 30 OCTAOC-4 · Financial statements · FY 2025-26in 13 days 7 NOVTDS / TCS deposit · Deducted in Oct 2026in 21 days 11 NOVGSTR-1 · Outward supplies · Oct 2026in 25 days 15 NOVPF & ESI · Contributions · Oct 2026in 29 days 21 NOVITR filing · Audit cases · AY 2026-27 · extended from 31 Octin 35 days 29 NOVMGT-7 / 7A · Annual return · FY 2025-26in 43 days
All due dates

Overhead absorption rates, the machine hour rate and under- or over-absorption: how overheads are charged to each product or job, with a worked example for an engineering workshop

Overhead absorption rate = budgeted overhead ÷ budgeted base (machine hours, labour hours, direct wages, material cost or units). Charge each job at the predetermined rate × its...

Published
Updated
Reading time
6 min
Views
19
Questions
6 answered
  • Expert Reviewed
  • Medium Complexity
Topic
Accounting Standards & Bookkeeping
Published
October 4, 2026
Last updated
Oct 4, 2026
Reading time
6 min
0:00
Last updated: October 2026Verified against: Government sources

Overheads cannot be traced to a single job, yet a job quote that ignores them loses money. An absorption rate turns a pool of overhead into a rate per hour, per rupee of wages or per unit, so every job picks up its share. For a workshop built around machines, the machine hour rate is the fairest such rate.

What it answers and the data you need

The question is "what overhead should this job carry?" You need the overhead budget for the year (after department apportionment, see the guide on overhead apportionment), a realistic estimate of the base (hours the machine will actually run), and at year end the actual overhead and actual hours. Owners who want a rate card built for their quotations can ask for a costing and pricing analysis.

Choosing a base

BaseRate formulaWhere it fits
Direct material costOverhead ÷ direct material costMaterial-heavy work with steady prices
Direct labour costOverhead ÷ direct wagesLabour-driven work with similar wage rates
Direct labour hoursOverhead ÷ labour hoursLabour-driven work with different wage rates
Machine hoursOverhead ÷ machine hoursMachine-driven work
UnitsOverhead ÷ unitsOne uniform product

A blanket rate averages the whole factory; a departmental rate uses one rate per department. Use departmental rates where jobs use departments differently. A predetermined (budgeted) rate is fixed before the year so quotes can be given; an actual rate is known only at year end and swings with volume.

The machine hour rate

Machine hour rate = (annual machine-related overheads) ÷ (expected productive machine hours). Machine-related overheads include depreciation, power for running, repairs and maintenance, consumables, insurance and the machine's share of rent. Expected productive hours exclude set-up, planned maintenance and idle time. The operator's wage is treated separately, as direct labour, or included if one operator runs one machine all year.

Capacity terms. Full capacity is the theoretical maximum; practical capacity allows for breaks and servicing; normal capacity is the average utilisation over a few years; budgeted capacity is next year's expected level. Dividing by a lower capacity gives a higher rate, so choose the level consciously.

Worked example: an engineering workshop with one CNC machine

Annual budget (all assumed):

Machine overhead₹
Depreciation300,000
Power for running192,000
Repairs and maintenance72,000
Consumables36,000
Insurance12,000
Share of floor rent60,000
Total672,000

Available hours: 2,400 (8 hours × 25 days × 12 months). After set-up and servicing, expected productive hours = 2,100.

Machine hour rate = 672,000 ÷ 2,100 = ₹320 per hour.

A job needing 5 machine hours carries 5 × 320 = ₹1,600 of machine overhead (plus its material, wages and other costs).

Year-end position (actual). Actual machine overhead ₹690,000; actual machine hours 2,000.

  • Overhead absorbed = 2,000 × 320 = 640,000.
  • Under-absorbed overhead = 690,000 − 640,000 = ₹50,000.

Why? Split it:

  • Spending: 690,000 − 672,000 = 18,000 more than budget.
  • Volume: (2,100 − 2,000) × 320 = 32,000 of overhead that the lost 100 hours would have recovered.
  • Total 18,000 + 32,000 = 50,000, which agrees with the gap above.

Treating under- and over-absorbed overhead

If the gap is small and arises from ordinary variation, write it off to the costing profit and loss account for the period. If it is large because of a genuine error in the rate, spread it over work in progress, finished goods and cost of goods sold in proportion to the overhead absorbed in each. An abnormal item, such as a long machine breakdown, is better written off, because loading it onto products would make them appear costlier than they should be.

Here the owner would conclude: of ₹50,000 under-recovered, ₹32,000 reflects idle capacity (a sales or planning issue, not a cost of the product) and ₹18,000 reflects overspending (a control issue). The ₹320 rate itself should be revisited only if 2,100 hours was too hopeful. For next year, if sales support only 2,000 hours, a rate on that basis would be 672,000 ÷ 2,000 = ₹336 per hour; quote at ₹320 only if you are confident of reaching 2,100 hours.

Common mistakes

  • Dividing by available hours instead of productive hours, which understates the rate.
  • Including the operator's wage in the rate and again as direct labour.
  • Using a factory-wide rate when one department is machine-heavy and another is manual.
  • Ignoring the gap: persistent under-absorption means quotes are too low.
  • Using a rate based on the actual month's volume, which makes the quote higher in slack months and lower in busy ones.

The rate flows into the job cost sheet and the standard overhead variances, which look at the same split in a standard costing setting.

Need help with setting overhead rates?

If quotes are made on a rule of thumb, we can help build department-wise rates from your own accounts and test them against past jobs through a costing and pricing analysis.

Key takeaways

  • Absorption rate = budgeted overhead ÷ budgeted base; use a predetermined rate.
  • A machine hour rate suits machine-driven work: overhead ÷ expected productive machine hours.
  • Under-absorption = actual overhead − absorbed overhead (absorbed < actual); over-absorption is the reverse.
  • Split the gap into a spending part and a volume part.
  • Write off small or abnormal gaps; spread large, rate-related gaps over stock and cost of sales.

Read next

Disclaimer: The methods described are standard cost accounting and financial management techniques. The worked example uses an invented business and invented figures, including any tax, interest or exchange rate, which are assumptions for illustration and not current rates. Where the article refers to a legal requirement, the linked guide and the official text should be checked. This article is general information, not legal advice; check the official text before acting.

Quick recapKey facts & short answers

Key Facts About Overhead absorption

  • Applies in: All states across India, under the relevant central law.
  • Mode: Mostly online via the official government portal.
  • Typical timeline: Ranges from a few days to a few weeks depending on the case.
  • Non-compliance: May attract penalties, interest or late fees.
  • Expert help: TaxClue completes the entire process end to end for you.

Why use a predetermined rate rather than the actual rate?

Quotes and monthly costs are needed before the year's actual figures are known. A predetermined rate also avoids rates that swing with volume.

What if I run two machines?

Compute a rate for each machine, because depreciation, power and repair costs differ.

Good compliance is boring by design; the drama starts only when something has been skipped.

— TaxClue Compliance Desk

Overhead absorption: a key compliance topic in Indian tax and corporate law that businesses and individuals must understand to remain compliant.

Related Services & Guides

Was this article helpful?
About the author
13,350 articles
Vikas Sharma Verified expert Tax & Compliance Expert

Experienced in company registration, GST, trademark, and compliance. Helping Indian businesses stay compliant.

Last reviewed: Live

Disclaimer: This article is for general informational purposes only and does not constitute professional tax, legal or financial advice. Laws, rates and due dates change and can vary by individual case — always verify with the relevant government source (e.g. mca.gov.in, incometax.gov.in) or consult a qualified professional before acting. TaxClue accepts no liability for decisions taken based on this content.

People also ask

Questions, answered

Short, direct answers to the 6 questions readers ask most on this topic.

Quotes and monthly costs are needed before the year's actual figures are known. A predetermined rate also avoids rates that swing with volume.

Compute a rate for each machine, because depreciation, power and repair costs differ.

It is a shortfall in recovering overhead through jobs. It becomes a loss if prices were set at the absorbed rate and cannot be raised.

Set-up hours are usually excluded from productive hours, and their cost is recovered in the rate or charged as set-up cost to the batch. Be consistent.

Normal or budgeted capacity is common. Using full capacity gives a low rate that is rarely recovered.

Not well. If one worker minds several machines, labour hours do not reflect the machine cost.