Next due
15 OCTPF & ESI · Contributions · Sep 2026due today 20 OCTGSTR-3B · Summary return · Sep 2026in 5 days 21 OCTTax Audit Report · Form 3CA/3CB · AY 2026-27 · extended from 30 Sepin 6 days 30 OCTAOC-4 · Financial statements · FY 2025-26in 15 days 7 NOVTDS / TCS deposit · Deducted in Oct 2026in 23 days 11 NOVGSTR-1 · Outward supplies · Oct 2026in 27 days 21 NOVITR filing · Audit cases · AY 2026-27 · extended from 31 Octin 37 days 29 NOVMGT-7 / 7A · Annual return · FY 2025-26in 45 days
All due dates

Overhead variances: variable overhead expenditure and efficiency, fixed overhead expenditure and volume, and how to read them, with a worked example for a small manufacturer

Standard overhead rate = budgeted overhead ÷ budgeted base (hours or units). Overhead absorbed = standard hours for actual output × rate. Variable overhead: expenditure variance...

Published
Updated
Reading time
6 min
Views
19
Questions
6 answered
  • Expert Reviewed
  • Medium Complexity
Topic
Accounting Standards & Bookkeeping
Published
October 4, 2026
Last updated
Oct 13, 2026
Reading time
6 min
0:00
Last updated: October 2026Verified against: Government sources

Overheads are a large part of a factory's cost, yet monthly reports often show them as a single total against budget. Overhead variances split the gap into causes: did we spend more than planned, did we run at a different volume, or did the machines work more slowly than standard? This guide shows how, for a plastics moulding unit.

What it answers and the data needed

You need the overhead budget (variable per hour and fixed for the period), the budgeted hours, the standard hours per unit, the month's actual output, actual hours and actual overhead. The standard rate comes from the same method as the overhead absorption rate, applied to variable and fixed costs separately. Owners build such a report as part of cost reduction and profitability work.

The formulas

Sign: favourable (F) when actual is better than standard; adverse (A) when worse.

VarianceFormula in wordsSymbols
Variable overhead expenditureStandard rate × actual hours − actual variable overheadSR × AH − AVO
Variable overhead efficiency(Standard hours for actual output − actual hours) × standard rate(SH − AH) × SR
Variable overhead totalStandard variable overhead for actual output − actualSH × SR − AVO
Fixed overhead expenditureBudgeted fixed overhead − actual fixed overheadBFO − AFO
Fixed overhead volumeAbsorbed fixed overhead − budgeted fixed overheadSH × SFR − BFO
Capacity (part of volume)(Actual hours − budgeted hours) × fixed rate(AH − BH) × SFR
Efficiency (part of volume)(Standard hours for actual output − actual hours) × fixed rate(SH − AH) × SFR
Fixed overhead totalAbsorbed − actualSH × SFR − AFO

Volume variance = capacity + efficiency. Some firms also show a calendar variance for different working days; it is not needed here.

Worked example: a plastics moulding unit

All figures assumed. Standard time is 0.5 machine hour per unit.

  • Budget for the month: 6,000 units = 3,000 hours. Variable overhead ₹10 an hour; fixed overhead ₹120,000.
  • Standard fixed overhead rate = 120,000 ÷ 3,000 = ₹40 an hour.
  • Actual: output 5,600 units; actual machine hours 3,100; actual variable overhead ₹31,800; actual fixed overhead ₹123,000.
  • Standard hours for actual output = 5,600 × 0.5 = 2,800 hours.

Variable overhead

  • Standard variable overhead for the output = 2,800 × 10 = 28,000.
  • Expenditure = (10 × 3,100) − 31,800 = 31,000 − 31,800 = −800 (A).
  • Efficiency = (2,800 − 3,100) × 10 = −3,000 (A).
  • Total = 28,000 − 31,800 = −3,800 (A); check: −800 − 3,000.

Fixed overhead

  • Absorbed = 2,800 × 40 = 112,000.
  • Expenditure = 120,000 − 123,000 = −3,000 (A).
  • Volume = 112,000 − 120,000 = −8,000 (A), made of:
  • Capacity = (3,100 − 3,000) × 40 = +4,000 (F).
  • Efficiency = (2,800 − 3,100) × 40 = −12,000 (A).
  • Check: +4,000 − 12,000 = −8,000.
  • Total = 112,000 − 123,000 = −11,000 (A); check: −3,000 − 8,000.
Variance₹F or A
Variable overhead expenditure800A
Variable overhead efficiency3,000A
Fixed overhead expenditure3,000A
Fixed overhead capacity4,000F
Fixed overhead efficiency12,000A
Total overhead variance14,800A

Check the total another way: overhead absorbed = 28,000 + 112,000 = 140,000; actual overhead = 31,800 + 123,000 = 154,800; difference 14,800 adverse. This difference is the under-absorption seen in the absorption guide, now split into causes.

What the owner decides. Most of the problem (₹15,000 of adverse efficiency across variable and fixed) comes from the machines taking 3,100 hours to make output that should have taken 2,800: scrap, slow cycles or setting problems. The machines ran 100 hours more than budget, which gives a favourable capacity variance of ₹4,000, but it does not offset the efficiency loss. Overspending is smaller: ₹800 on variable overhead for the hours worked and ₹3,000 on fixed overhead against budget. The first action is a review of cycle times and rejects on the moulding machines; the second, a check on what fixed costs went up by 3,000.

How to read the result

Fixed overhead per hour is an artefact of the budgeted hours: the volume variance does not mean cash was lost, but that the unit recovered less overhead than planned. Efficiency affects both variable and fixed variances, so add them together when judging the production team. Report variances by cost head to the manager of that head. Repeated adverse variances call for a look at the standard.

Common mistakes

  • Treating fixed overhead per unit as if it were variable.
  • Forgetting that efficiency appears under both variable and fixed overhead.
  • Reporting volume variance to the production manager when the cause is a shortage of orders.
  • Computing the variable overhead expenditure variance on standard hours instead of actual hours.
  • Ignoring the sign convention.

The materials and labour side of the same analysis is in standard costing: material and labour variances; budgets that move with activity are in the guide on flexible budgets.

Need help with overhead control?

If your monthly report shows overhead as one figure against budget, we can help split it into variances by cause and cost head as part of a cost reduction and profitability review.

Key takeaways

  • Variable overhead: expenditure and efficiency; fixed overhead: expenditure and volume.
  • Fixed volume variance = capacity + efficiency.
  • Total overhead variance equals actual overhead minus absorbed overhead (sign reversed).
  • Efficiency shows in both variable and fixed variances.
  • Fixed overhead rates depend on budgeted hours; interpret volume with care.

Read next

Disclaimer: The methods described are standard cost accounting and financial management techniques. The worked example uses an invented business and invented figures, including any tax, interest or exchange rate, which are assumptions for illustration and not current rates. Where the article refers to a legal requirement, the linked guide and the official text should be checked. This article is general information, not legal advice; check the official text before acting.

Quick recapKey facts & short answers

Key Facts About Overhead variances

  • Applies in: All states across India, under the relevant central law.
  • Mode: Mostly online via the official government portal.
  • Typical timeline: Ranges from a few days to a few weeks depending on the case.
  • Non-compliance: May attract penalties, interest or late fees.
  • Expert help: TaxClue completes the entire process end to end for you.

Why is there a fixed overhead volume variance at all?

Fixed overhead is absorbed at a rate per hour or unit. If output differs from the budget, absorbed overhead differs from the budget even if spending is on target.

What is the capacity variance?

The effect of working more or fewer hours than budgeted, valued at the fixed overhead rate.

Keep the acknowledgement. A filing you cannot prove is a filing you may have to defend.

— TaxClue Compliance Desk

Overhead variances: a key compliance topic in Indian tax and corporate law that businesses and individuals must understand to remain compliant.

Related Services & Guides

Was this article helpful?
About the author
13,350 articles
Vikas Sharma Verified expert Tax & Compliance Expert

Experienced in company registration, GST, trademark, and compliance. Helping Indian businesses stay compliant.

Last reviewed: Live

Disclaimer: This article is for general informational purposes only and does not constitute professional tax, legal or financial advice. Laws, rates and due dates change and can vary by individual case — always verify with the relevant government source (e.g. mca.gov.in, incometax.gov.in) or consult a qualified professional before acting. TaxClue accepts no liability for decisions taken based on this content.

People also ask

Questions, answered

Short, direct answers to the 6 questions readers ask most on this topic.

Fixed overhead is absorbed at a rate per hour or unit. If output differs from the budget, absorbed overhead differs from the budget even if spending is on target.

The effect of working more or fewer hours than budgeted, valued at the fixed overhead rate.

Not if the extra hours produced little. Read it with the efficiency variance.

Variable overhead is charged on hours; taking more hours than standard increases variable overhead.

Start with total variable and total fixed variances and split them when they are large.

They are written off or spread as explained in the absorption guide.