Ind AS 37 is the gatekeeper for provisions: a liability of uncertain timing or amount goes into the balance sheet only if there is a present obligation from a past event, an outflow is more likely than not, and the amount can be estimated reliably. Everything else is either disclosed as a contingent liability or left out. This guide covers the tests, the measurement rules and three worked cases.
Recognise a provision when there is a present obligation from a past event, an outflow is probable (more likely than not) and a reliable estimate exists (paragraphs 14 and 23). Measure it at the most reasonable estimate of the expenditure to settle at the reporting date (paragraph 36), at present value where the time value of money is material (paragraph 45). An onerous contract is provided at the lower of the cost of fulfilling it and the penalty for exit (paragraph 68). Never recognise a contingent liability (paragraph 27).
Ind AS as on 1 April 2025 (ICAI Compendium of Ind AS 2025-26, the standards notified under the Companies (Indian Accounting Standards) Rules, 2015). Amendments notified after 1 April 2025 are not reflected in this article and should be checked on mca.gov.in. Provision schedules are among the first things an auditor asks for in financial statement preparation reviews.
What the paragraphs require
| Paragraph | Requirement | What it means in practice |
|---|---|---|
| 14-17 | Present obligation (legal or constructive) from a past event, probable outflow, reliable estimate; obligating event leaves no realistic alternative | A future cost that the business can avoid is not a provision (paragraph 19) |
| 20 | A board decision is not a constructive obligation unless communicated before the reporting date to those affected | Communicate before year end or disclose after (paragraph 75) |
| 23-26 | Probable means more likely than not; assess similar obligations as a class | A warranty class can be provided though no single claim is likely |
| 27-35 | Contingent liabilities and assets are not recognised; disclose a contingent liability unless remote, and a contingent asset when an inflow is probable | Reassess each period |
| 36-44 | Measure at the most reasonable estimate; expected value for a large population, most likely outcome for a single obligation; before tax; reflect risk without excess | Do not pad |
| 45-47 | Present value at a pre-tax rate reflecting time value and risks specific to the liability | Do not double count risk |
| 48-52 | Reflect future events with objective evidence; ignore gains on expected disposals | New technology only on evidence |
| 53-58 | Reimbursement is a separate asset only when virtually certain, capped at the provision | Presentation may be net in profit or loss |
| 59-62 | Review each period; unwinding is a borrowing cost; use a provision only for its purpose | Reverse if no longer probable |
| 63-69 | No provision for future operating losses; onerous contracts provided at least net cost of exit; impairment of dedicated assets first | Cost to fulfil includes an allocation of related depreciation (paragraph 68A) |
| 70-83 | Restructuring: detailed formal plan and valid expectation; only direct, necessary costs; no sale commitment without a binding agreement | Retraining and relocation of continuing staff are excluded (paragraph 81) |
| 84-92 | Disclose movements by class, timing and uncertainties, contingent liabilities | A table of opening, additions, used, reversed and unwinding |
Non-Ind AS companies follow a different standard, explained in our AS 29 guide. The standard is outlined in Ind AS 37 Provisions, Contingent Liabilities and Contingent Assets.
The method
- Test the three conditions in paragraph 14.
- If an outflow is not probable, consider disclosing a contingent liability (paragraphs 16(b) and 28).
- Estimate: expected value for many similar items (paragraph 39), the most likely outcome adjusted for other outcomes for a single item (paragraph 40).
- Discount at a pre-tax rate where material (paragraphs 45 to 47).
- Recognise any virtually certain reimbursement as a separate asset (paragraph 53).
- At each reporting date, review, unwind and reverse if no longer probable (paragraphs 59 and 60).
Worked example
The entity and all figures in this example are invented for illustration. The discount rate is assumed, for arithmetic only.
Case 1: warranty provision by expected value (paragraphs 24 and 39). Tapovan Appliances Limited has sold 12,000 units in the last six months with a twelve-month warranty. Each claim costs Rs 3,000 to repair. The company assesses three scenarios for the share of units that will be claimed on.
| Scenario | Probability | Claim rate | Weighted rate |
|---|---|---|---|
| Low | 40% | 3% | 1.20% |
| Medium | 35% | 5% | 1.75% |
| High | 25% | 8% | 2.00% |
| Expected claim rate | 4.95% |
Expected claims = 12,000 x 4.95% = 594 units. Provision = 594 x Rs 3,000 = Rs 17,82,000. Because there are many similar obligations, they are assessed as a class (paragraph 24).
Case 2: site restoration provision, discounted (paragraphs 45 to 47 and 60). A quarry operator has extracted material and must restore the land for the damage already done. The restoration will cost Rs 3,00,00,000 and be paid at the end of 5 years. The pre-tax rate reflecting the time value of money and the risks of this liability is 9 per cent (assumed). The estimate already reflects the risks, so none is added to the rate (paragraph 47). Present value = 3,00,00,000 x 0.6499 = Rs 1,94,97,942 (computed on the unrounded factor 0.649931).
| Year | Opening (Rs) | Unwinding at 9% (Rs) | Closing (Rs) |
|---|---|---|---|
| 1 | 1,94,97,942 | 17,54,815 | 2,12,52,757 |
| 2 | 2,12,52,757 | 19,12,748 | 2,31,65,505 |
| 3 | 2,31,65,505 | 20,84,895 | 2,52,50,400 |
| 4 | 2,52,50,400 | 22,72,536 | 2,75,22,936 |
| 5 | 2,75,22,936 | 24,77,064 | 3,00,00,000 |
The unwinding is recognised as a borrowing cost each year (paragraph 60), and the schedule closes at the undiscounted amount. Total unwinding is Rs 1,05,02,058, equal to 3,00,00,000 - 1,94,97,942. If the company also holds an insurance policy under which a recovery is virtually certain, the recovery is shown as a separate asset capped at the provision (paragraph 53).
Case 3: an onerous supply contract (paragraphs 66 to 69 and 68A). Palar Metals Limited has agreed to supply 4,000 tonnes more at Rs 52,000 a tonne. Cost to fulfil per tonne is Rs 55,000 of incremental cost plus Rs 3,000 allocated depreciation of plant used for the contract (paragraph 68A(b)): Rs 58,000. Terminating the contract would cost a penalty of Rs 1,80,00,000.
| Working | Rs |
|---|---|
| Economic benefits expected: 4,000 x 52,000 | 20,80,00,000 |
| Cost of fulfilling: 4,000 x 58,000 | 23,20,00,000 |
| Net cost of fulfilling | 2,40,00,000 |
| Penalty on exit | 1,80,00,000 |
| Unavoidable cost (lower of the two), paragraph 68 | 1,80,00,000 |
The contract is onerous because unavoidable costs exceed the benefits expected. The provision is Rs 1,80,00,000, after first testing the plant used for this contract for impairment (paragraph 69).
| Particulars | Debit (Rs) | Credit (Rs) |
|---|---|---|
| Warranty expense (profit or loss) | 17,82,000 | |
| To Provision for warranty | 17,82,000 | |
| Site restoration cost (to the asset or profit or loss, as the governing standard requires) | 1,94,97,942 | |
| To Provision for restoration | 1,94,97,942 | |
| Loss on onerous contract (profit or loss) | 1,80,00,000 | |
| To Provision for onerous contract | 1,80,00,000 |
Check. Case 1: 4.95% x 12,000 = 594 and 594 x 3,000 = 17,82,000. Case 2: the closing balance of year 5 equals the undiscounted Rs 3,00,00,000. Case 3: 23,20,00,000 - 20,80,00,000 = 2,40,00,000, higher than the penalty, so the penalty is the provision. Total provisions at recognition: 17,82,000 + 1,94,97,942 + 1,80,00,000 = Rs 3,92,79,942, equal to the total of the debits above.
A contingent liability. Suppose a customer claims Rs 50,00,000 for a defect and the company's lawyers advise that it is more likely that no obligation exists, with an outflow not remote. No provision is made; the nature of the claim, its estimated financial effect and the uncertainty are disclosed (paragraphs 16(b) and 86).
Restructuring in brief
A restructuring provision needs a detailed formal plan, with the business, locations, employees affected, expenditure and timing, and a valid expectation raised by starting to implement the plan or announcing its main features (paragraph 72). A board decision before the year end is not enough unless one of those two things has happened before the reporting date (paragraph 75). The provision covers only direct expenditure necessarily entailed and not tied to ongoing activities, so retraining or relocating continuing staff, marketing and new systems are excluded (paragraphs 80 and 81), as are future operating losses and gains on expected asset sales (paragraphs 82 and 83). A sale is a commitment only once there is a binding agreement (paragraph 78).
Government levies in brief
For a levy imposed by government under legislation, the obligating event is the activity that triggers payment, as identified by the legislation (Appendix C, paragraph 8). Being economically compelled to operate in a future period, or preparing accounts on a going concern basis, does not create a present obligation (paragraphs 9 and 10). If the triggering activity occurs over a period, such as generating revenue, the liability builds up progressively (paragraph 11), and a levy paid before the obligation arises is a prepaid asset (paragraph 14). Income taxes and fines are outside the Appendix (paragraph 4).
Presentation and disclosure
For each class of provision, paragraph 84 requires the opening and closing carrying amounts, additions, amounts used, unused amounts reversed and the increase from the passage of time and any change in discount rate; paragraph 85 adds the nature and timing of the outflow, the uncertainties and any expected reimbursement; paragraph 86 deals with contingent liabilities. Where a restoration provision forms part of a plant's cost, see PPE under Ind AS 16; for employee-related provisions, see defined benefit plans under Ind AS 19.
Common mistakes
- Providing for a future repair, retraining or relocation cost the business could avoid (paragraph 19).
- Recognising a restructuring provision on a board resolution alone (paragraph 75).
- Discounting at a rate that already allows for risks built into the cash flows (paragraph 47).
- Taking the cost of fulfilling an onerous contract as the provision without comparing it with the exit penalty (paragraph 68).
- Netting an insurance recovery that is merely probable against the provision (paragraph 53).
- Leaving out the unwinding of the discount (paragraph 60).
Need help with provisions and contingencies?
If your provisions are a list of round numbers that nobody can reconcile to a method, we can rebuild them with probabilities, discounting and a movement table. Our team prepares these schedules and the matching disclosures as part of financial statement preparation.
Key takeaways
- Three conditions: present obligation, probable outflow, reliable estimate.
- Expected value for many items; most likely outcome adjusted for a single item.
- Discount at a pre-tax rate where material and unwind through borrowing cost.
- Onerous contract: the lower of fulfilment cost and exit penalty, after testing assets for impairment.
- Contingent liabilities are disclosed, never recognised.
Read next
- Property, plant and equipment under Ind AS 16: components, revaluation and decommissioning
- Defined benefit plans under Ind AS 19: gratuity obligation, plan assets and remeasurements
- Impairment of assets under Ind AS 36: CGU, value in use and goodwill
- AS 29 Provisions, Contingent Liabilities and Contingent Assets
Disclaimer: Based on the Indian Accounting Standards as on 1 April 2025 (ICAI Compendium of Ind AS 2025-26, the standards notified under the Companies (Indian Accounting Standards) Rules, 2015) and, where named, the ITFG clarification bulletins of ICAI, as consulted on 4 October 2026. The worked example uses invented figures. Amendments notified after 1 April 2025 should be checked on mca.gov.in. This article is general information, not legal advice; check the official text before acting.