Greenfield Method explained: this guide covers what it means, who it applies to, the step-by-step process, documents required, fees, due dates and penalties in India — so you can stay compliant with confidence and avoid costly mistakes.
Strip the business down to one asset and make it earn its way from an empty field. Whatever is left over is what the licence is worth.
The premise
Under this method, the value of an intangible is estimated using cash flow projections that assume the only asset of the business as on the valuation date is the subject intangible. All other tangible and intangible assets must be bought, built, or rented.
This method is similar to the excess earnings method as it identifies the excess cash flow associated with the subject asset. However, instead of adjusting contributory asset charges from the cash flows, the greenfield method assumes that the owner of the subject asset needs to build, buy or rent the contributory assets.
This method is normally used in valuing franchise-based intangible assets and broadcast spectrum intangibles.
Both methods answer the same question — what does this asset earn once every other asset has been paid for — but they pay for the other assets differently.
MEEM deducts a contributory asset charge: a notional return on assets the business already has, expressed as a percentage. Greenfield instead models the actual expenditure of acquiring them, with amount and timing.
That difference is why greenfield suits licences and spectrum. A telecom licence confers the right to operate but no network — the holder must genuinely build one, and the build has a capital profile and a lag before revenue. A percentage charge cannot represent an INR 100 crore outlay in year 0 followed by revenue starting in year 1.
The consequence is visible in the illustration: the year-0 cash flow is minus 100. A greenfield valuation routinely produces negative early cash flows, which is arithmetically correct and often surprising to reviewers who expect an intangible to generate value from day one.
Note the sensitivity this creates. The licence is worth 10.65 against a terminal value of 129.65 and an initial outlay of 100 — the answer is a small difference between large numbers, so a modest change in the build cost or the terminal growth rate moves it dramatically.
The five steps
- Prepare cash flow projections with the premise that the intangible is the only asset in the business.
- Project the related revenues, expenses, working capital and capital.
- Project the amount and timing of expenditure relating to acquisition, creation or rentals of other assets required by the intangible asset to be valued.
- Compute the present value of the net cash flows using an appropriate discount rate.
- Tax amortisation benefit (TAB) can be appropriately built and added to the overall value of the intangible asset.
Illustration 14 — a telecom licence
| INR Cr | 0 | 1 | 2 | 3 | 4 | 5 | Terminal |
|---|---|---|---|---|---|---|---|
| Revenue | 70.00 | 77.00 | 84.70 | 93.17 | 102.49 | 105.56 | |
| Operating profit @ 40% | 28.00 | 30.80 | 33.88 | 37.27 | 40.99 | 42.22 | |
| Less: Taxes @ 25% | 7.00 | 7.70 | 8.47 | 9.32 | 10.25 | 10.56 | |
| After-tax profit | 21.00 | 23.10 | 25.41 | 27.95 | 30.75 | 31.67 | |
| Less: Capex | −100 | −20.00 | −20.00 | −20.00 | −20.00 | −20.00 | −20.00 |
| Net cash flows | −100 | 1.00 | 3.10 | 5.41 | 7.95 | 10.75 | 11.67 |
| Discount factor @ 12% | 1.0000 | 0.8929 | 0.7972 | 0.7118 | 0.6355 | 0.5674 | 0.7118 |
| PV of cash flows | −100.00 | 0.89 | 2.47 | 3.85 | 5.05 | 6.10 | 92.28 |
Terminal value 129.65; value of licence 10.65.
Reading the result
Maintenance capex of 20 crore a year against after-tax profit rising from 21 to 30.75 leaves almost nothing in the early years. The licence's value comes overwhelmingly from the terminal period, once the network is built and the capital burden is being outgrown.
That is a faithful picture of infrastructure economics — and it is also a warning. A greenfield method result that depends this heavily on a perpetuity should be stress-tested against the growth rate, the margin and the build cost before it is relied on.
Common mistakes
- Deducting contributory asset charges as well as modelling the build cost.
- Starting revenue in year 0, before the infrastructure exists.
- Omitting maintenance capital expenditure after the initial build.
- Reporting a value without testing the terminal assumptions that produce it.