Development Rights explained: this guide covers what it means, who it applies to, the step-by-step process, documents required, fees, due dates and penalties in India, so you can stay compliant with confidence and avoid costly mistakes.
The land did not change. The permission to build on it did, and the market repriced the company by ten per cent in a day.
The FSI case
As of 22nd January 2015, shares of DB Realty were locked in an upper circuit of 10% at INR 79.35 on the BSE after the company's project DB Orchid Heights at Mahalaxmi, Mumbai, received a go-ahead from the Maharashtra Government for the development of 3 Floor Space Index (FSI) as against an earlier FSI of 2.5. The approval came through on the 19th of January 2015, bringing in substantial positive development for the company as the Mahalaxmi project has significant revenue potential.
This development boosts the company's IOD potential from 23,000 square meters to 37,000 square meters; an increase of 60% and added another INR 1,500 Crores to the company's total sale potential, thereby bringing it to INR 4,000 Crores.
The TDR case
In March 2017, the BMC granted Mumbai based builder Lodha Group permission to utilize Transferable Development Rights (TDR) anywhere in Mumbai, including in the island city. Till this approval, TDR was prohibited in the island city and was only permitted in the suburbs. However, a government mandate introduced in November 2016 changed this norm and TDR can now be used anywhere in the city, including South Mumbai, where property prices are among the highest in the world.
Lodha had surrendered around an acre of its 17.5-acre property at Shreeniwas Mills, Lower Parel to MHADA free of cost for housing mill workers. As compensation under the new 2016 policy, the company received 12,000 square meters from the BMC's development plan department. Lodha Group can use these additional construction rights for construction anywhere in the city or sell the entire block to a third party.
Both are development rights created by a regulator, but they are identifiable for different reasons, and that difference governs how each is valued.
FSI is site-specific. The permission to build at an index of 3 rather than 2.5 attaches to DB Orchid Heights at Mahalaxmi and travels nowhere. It is identifiable because it arises from contractual or other legal rights, not because it is separable. Its value is inseparable from that project's economics, which is why the disclosure is framed as added sale potential on that site.
TDR is separable. Lodha can use these additional construction rights for construction anywhere in the city or sell the entire block to a third party. That is the separability limb in its purest form, capable of being separated and sold, transferred, licensed, rented or exchanged.
The valuation consequence is direct. A separable, tradeable right has observable market prices, so the market approach becomes viable, the one context in intangible valuation where it usually is not defeated by bundling, because TDR trades on its own.
Site-specific FSI has no such market. It must be valued by the income it enables: the incremental saleable area, at the project's realisations, less the cost of building it.
Note the second thing the Lodha case illustrates, that the right's value depends on where it may be used. The same 12,000 square metres was worth far less before the November 2016 mandate permitted island-city use. The asset did not change; the legal restriction on it did, and legal factors may restrict the period over which the entity controls access to these benefits.
How each is valued
| FSI (DB Realty) | TDR (Lodha) | |
|---|---|---|
| Identifiable because | Legal right granted for a specific project | Separable — saleable to a third party |
| Transferable | No | Yes, anywhere in the city |
| Preferred approach | Income — incremental saleable area | Market — observed TDR prices |
| Disclosed effect | +INR 1,500 crore sale potential; area up 60% | 12,000 sq m of construction rights |
What the consideration was
The TDR was not bought for cash. Lodha surrendered around an acre of a 17.5-acre site free of cost and received construction rights in return, a non-monetary exchange. The cost of the intangible is the fair value of what was given up, not nil.
Common mistakes valuing development rights
- Treating site-specific FSI as tradeable.
- Valuing incremental FSI at gross sale potential without construction cost.
- Ignoring the legal restrictions on where a TDR may be used.
- Recording a TDR received against surrendered land at nil cost.