Rules 46-48 explained: this guide covers what it means, who it applies to, the step-by-step process, documents required, fees, due dates and penalties in India — so you can stay compliant with confidence and avoid costly mistakes.
These last three rules give the Controller two general powers and then close the Rules. One lets him allow the amendment of a document, and correct an irregularity in procedure, when the Act makes no special provision. Another lets him enlarge the time prescribed by the Rules for doing any act or taking any proceeding. The last repeals the Designs Rules, 1933 and saves pending matters. If a deadline under the Rules is about to be missed, our legal consultation team can advise whether a petition under rule 47 is the right step.
Rule 46 (printed without its number in the text) lets any document for which the Act makes no special amendment provision be amended, and a procedural irregularity that can be put right without harm to anyone be corrected, on terms the Controller directs. Rule 47 lets the Controller enlarge any time prescribed by the Rules, on terms he directs. Rule 48 repeals the Designs Rules, 1933, but pending matters continue under those rules.
Source note
These rules are read as notified in 2001; the Designs (Amendment) Rules, 2021 (G.S.R. 45(E)) did not change their text, but the First Schedule as substituted in 2021 has fee entries for petitions under rules 46 and 47. The 2014 amendment (G.S.R. 925(E)) is not in the sources consulted, and later amendments should be checked. The Rules are made under section 47 of the Designs Act, 2000, and the repeal and savings of the older law is dealt with in section 48 of the Act.
Rule 46: general power of amendment
In the text consulted this rule is printed without its number. The heading line reads "General Power of amendment." It is rule 46 because it sits between rules 45 and 47 and because the First Schedule (entry 25) and the Fourth Schedule speak of "rule 46" for amendment of documents. This is a printing omission, not a gap in the Rules.
The text: "Any document for the amending of which no special provision is made by the Act may be amended, and any irregularity in procedure which, in the opinion of the Controller, may be obviated without detriment to the interest of any person, may be corrected if the Controller thinks fit, and upon such terms as he may direct."
The rule has two limbs:
- Documents. A document may be amended if the Act makes no special provision for amending it. Where the Act has its own provision (for example for correction of clerical errors in the Register, covered by section 29 and Form 14), that provision is used.
- Irregularities. An irregularity in procedure may be corrected if, in the Controller's opinion, it "may be obviated without detriment to the interest of any person".
Both are discretionary ("may", "if the Controller thinks fit") and both are "upon such terms as he may direct".
As per the Schedule as substituted in 2021 (entry 25), the fee on a petition under rule 46 for amendment of any document is Rs 500 in the column for natural persons, startups and small entities, and Rs 2000 in the column for others. No form number is printed. Check the current Schedule before paying.
Rule 47: general power to enlarge time
"The time prescribed by these rules for doing any act or taking any proceeding thereunder maybe enlarged by the Controller, if he thinks fit, and upon such terms as he may direct." (Slip: "maybe" for "may be".)
- What can be enlarged: time "prescribed by these rules".
- For what: "any act or ... any proceeding" under the Rules.
- Who decides: the Controller, "if he thinks fit".
- On what terms: "such terms as he may direct".
Two limits are implicit in the text. First, rule 47 speaks only of time prescribed by the Rules; a period fixed by the Act itself is not within it. Second, some Rules have their own extension provisions, such as rule 15(2) (priority document, up to three months) and rule 29(9) (extension in cancellation proceedings, never beyond three months in aggregate). The text does not say how rule 47 sits beside those, and whether it can be used to go beyond them is not stated.
As per the Schedule as substituted in 2021 (entry 26), the fee on a petition "under rules 29, 40, 47 for enlargement of time" is Rs 500 (first column) or Rs 2000 (second column). The 2001 Schedule referred only to rule 47 for this entry; the 2021 text adds rules 29 and 40. See our article on rule 29. Check the current Schedule before paying.
Rule 48: repeal
"The Designs Rules, 1933 are hereby repealed: Provided that any application or other matter pending under those rules on the date of the coming into force of these rules shall be disposed of under those rules."
- The earlier rules, the Designs Rules, 1933, were repealed.
- Anything pending under them on the date these Rules came into force is disposed of under the 1933 rules.
The Designs Act, 2000 repealed the Designs Act, 1911 (see section 48 of the Act); this rule deals with the subordinate rules. Rule 48 does not name the pending matters it saves or state a cut-off date other than "the date of the coming into force of these rules"; rule 1(2) says the Rules came into force on the date of their publication in the Official Gazette.
| Rule | Power | Fee head in the 2021 Schedule (first / second column) |
|---|---|---|
| 46 | amend a document; correct an irregularity | entry 25: Rs 500 / Rs 2000 |
| 47 | enlarge time prescribed by the Rules | entry 26: Rs 500 / Rs 2000 |
| 48 | repeal of the 1933 Rules; pending matters saved | no fee |
Illustrations (invented)
Amendment. Veda Fabrics finds that the applicant's name was misspelt in a document filed with its application. The Act does not provide a special amendment route for that document, so Veda petitions under rule 46. The Controller may allow the amendment on such terms as he directs.
Time. Orion Gadgets cannot file its evidence within the time allowed by the Rules because its affidavit is being sworn abroad. It petitions under rule 47 for more time. The Controller may enlarge the time, if he thinks fit and on terms, but is not bound to.
Old matter. A matter was pending under the 1933 rules when the 2001 Rules came into force. Under rule 48's proviso it is disposed of under the 1933 rules.
What the rules do not say
- They do not say how or when to petition under rules 46 and 47, beyond the fee entries.
- They do not say what terms the Controller may impose.
- Rule 47 does not state a limit on the enlargement.
- Rule 48 does not reproduce the 1933 rules, which are not in the sources consulted.
Need help with a missed deadline or a correction?
A petition for more time or for correction needs a clear reason and a quick filing. Our legal consultation team can assess the position, prepare the petition and advise on terms.
Key takeaways
- Rule 46 (printed without its number) allows amendment of documents with no special Act provision, and correction of harmless irregularities, on terms the Controller directs.
- Rule 47 allows the Controller to enlarge any time prescribed by the Rules, if he thinks fit and on terms.
- As per the Schedule as substituted in 2021, each petition carries Rs 500 or Rs 2000 depending on category.
- Rule 48 repeals the Designs Rules, 1933, with pending matters disposed of under them.
- The 2014 amendment is not in the sources consulted; check later amendments.
Read next
- Rules 44-45: opportunity of hearing and statement required by Controller
- First Schedule: fees for registration, renewal and other matters
- Introduction to Designs Act 2000: industrial design protection
Disclaimer: Based on the Designs Rules, 2001 as notified and the Designs (Amendment) Rules, 2021, as consulted on 1 October 2026. Other amendments may apply; fees and forms change from time to time. This article is general information, not legal advice; check the official text before acting.