Next due
7 OCTTDS / TCS deposit · Deducted in Sep 2026in 4 days 11 OCTGSTR-1 · Outward supplies · Sep 2026in 8 days 15 OCTPF & ESI · Contributions · Sep 2026in 12 days 20 OCTGSTR-3B · Summary return · Sep 2026in 17 days 30 OCTAOC-4 · Financial statements · FY 2025-26in 27 days 31 OCTITR filing · Audit cases · AY 2026-27in 28 days 29 NOVMGT-7 / 7A · Annual return · FY 2025-26in 57 days 15 DECAdvance Tax · 3rd (75%) instalment · FY 2026-27in 73 days
All due dates

Rules 3, 4, 5 and 6 of the Legal Metrology (General) Rules, 2011: Reference, secondary and working standards

The three tiers map to three Schedules: reference standards to the First Schedule, secondary standards to the Second Schedule and working standards to the Third Schedule. For each...

Published
Updated
Reading time
7 min
Views
0
Questions
6 answered
  • Expert Reviewed
  • Medium Complexity
Topic
Legal Metrology
Published
September 30, 2026
Last updated
Sep 30, 2026
Reading time
7 min
0:00
Last updated: September 2026Verified against: Government sources

Chapter II of the General Rules deals with the standards used to verify everyday weights and measures. Rule 3 covers reference standards, rule 4 secondary standards and rule 5 working standards. Rule 6 lets the Central Government specify other standards by notification. Each tier is tied to a Schedule.

Where these rules fit in the Act

Section 9 of the Act says the reference, secondary and working standards of weights and measures "shall be such as may be prescribed", that each is to be "verified and stamped in such manner and after payment of such fee as may be prescribed", and that a standard not verified and stamped "shall not be deemed to be a valid standard". Rules 3 to 6 are the prescribed specifications. For the section itself, see sections 9 and 10. The existing guide on the National Standards Rules, 2011 deals with a separate set of rules.

If you run a verification laboratory or a test centre, or work with standards in a business, our legal consultation service can help you read these rules against your equipment.

The three tiers in one table

RuleTierWeightsMetre barCapacity measures
3ReferenceFirst Schedule, Part IFirst Schedule, Part IINot mentioned in rule 3
4SecondarySecond Schedule, Part ISecond Schedule, Part IISecond Schedule, Part III
5WorkingThird Schedule, Part IThird Schedule, Part IIThird Schedule, Part III

Each row has two sub-rules per item: one on conformity (denomination, material used in construction and design) and one on maximum permissible error.

Rule 3: reference standards

  • 3(1): every reference standard weight must conform "as regards denomination, material used in construction, and design" to Part I of the First Schedule.
  • 3(2): the maximum permissible error in a reference standard weight, "on verification or re-verification after adjustment", is as in Part I of the First Schedule.
  • 3(3): every reference standard metre bar must conform, as regards material and design, to Part II.
  • 3(4): the maximum permissible error in a reference standard metre bar, on verification or re-verification, is as in Part II.

The wording differs slightly between weights and metre bars. For weights the error is judged after adjustment; for the metre bar no adjustment is mentioned, which suits a graduated bar. The First Schedule also has no capacity measure at the reference level, so this rule does not list one.

Rule 4: secondary standards

Rule 4 repeats the pattern and adds capacity measures:

  • 4(1) and (2): secondary standard weights, conformity and error per Part I of the Second Schedule.
  • 4(3) and (4): secondary standard metre bars, per Part II.
  • 4(5) and (6): secondary standard capacity measures, conformity as to denomination, material and design per Part III, and error "on verification or re-verification after adjustment" per Part III.

Rule 5: working standards

Rule 5 follows the same scheme, with the Third Schedule: weights (Part I), metre bars (Part II) and capacity measures (Part III), each with a conformity sub-rule and an error sub-rule (5(1) to (6)). The working standards are the ones used most in day-to-day verification, so they are the ones most often met by dealers, repairers and test centres. The text does not say who may hold them; that is governed by the Act and State practice.

What is in the Schedules

The scan of the First to Third Schedules is garbled in places (columns and numerals are damaged), so do not rely on copied tables. What is legible shows the kind of content:

ItemLegible points
Reference standard weightsDenominations in kilogram, gram and milligram series; materials such as bronze, nickel-chromium alloy and austenitic stainless steel, with aluminium for the smallest milligram weights; non-magnetic; boxes with inscriptions including the words "Reference Standards Weights" and a verification mark
Reference standard metre barMade of nickel-steel; graduated scale; an inscription including the words "REFERENCE STANDARD METRE BAR" and a verification mark
Secondary standardsParallel specifications with wider error limits than the reference tier, including capacity measures in Part III
Working standard capacity measuresLitre and millilitre series; pressed from copper sheet; engraved denominations; boxes marked "WORKING STANDARD CAPACITY MEASURES"

We do not reproduce the error tables: the OCR is damaged at several points, and the reader should use the gazette for any figure. The next article, on the First, Second and Third Schedules, goes through what can be read.

Rule 6: power to specify other standards

Rule 6 has two sub-rules:

  • 6(1): any other reference, secondary or working standard "shall conform as regards the denomination, material used in construction, and design, to such specifications as the Central Government may, from time to time, by notification, specify".
  • 6(2): the maximum permissible error for such other standards "shall be such as the Central Government may, from time to time, by notification, specify", and different errors may be specified for different types.

So the list in rules 3 to 5 is not exhaustive. New types of standards can be added by notification without amending the Rules. The text does not say any such notification has been issued; check the gazette for notifications under rule 6.

How the tiers relate

The tiers are a chain. The Rules show the links in the balance rules: reference standard balances verify secondary standards (rule 7), secondary balances verify working standards (rule 8), and working balances verify weights intended for use in transactions or for protection (rule 9). See rules 7 to 10. The Rules themselves do not draw the chain for metre bars and capacity measures; the Schedules give specifications, not the chain of verification.

Practical examples

Example 1. A laboratory wants to use a new type of weight as a working standard. It is not in the Third Schedule. Rule 6(1) says it must conform to specifications the Central Government specifies by notification; if none exists, the laboratory cannot assume it is acceptable.

Example 2. A state verification office checks a secondary standard capacity measure. Rule 4(5) and (6) send it to Part III of the Second Schedule for design and error.

Example 3. A student asks whether a reference standard capacity measure exists. Rule 3 lists weights and metre bars only; the Schedules follow rule 3.

Need help reading the standards rules?

Standards, their schedules and the power to specify more all sit across the Act, the Rules and notifications. Our legal consultation service can help you trace which specification applies to a given weight, bar or measure.

Key takeaways

  • Rule 3 is reference standards (First Schedule), rule 4 secondary (Second Schedule), rule 5 working (Third Schedule).
  • Each tier has weights and a metre bar; secondary and working tiers also have capacity measures.
  • Conformity covers denomination, material and design; error is judged on verification or re-verification.
  • Rule 6 lets the Central Government specify other standards and their errors by notification.
  • Section 9 of the Act makes an unverified, unstamped standard invalid.
  • The Schedules' scan is damaged, so read figures from the gazette.

Read next

Disclaimer: Based on the Legal Metrology (General) Rules, 2011 (the source is a two-column scan with garbling; figures must be checked against the gazette) and the Legal Metrology Act, 2009 (Act 1 of 2010) as enacted, read with the Jan Vishwas (Amendment of Provisions) Act, 2023 (in force) and the Jan Vishwas (Amendment of Provisions) Act, 2026 (in force only from the date the Central Government notifies), as on 30 September 2026. Section 9 is not amended by either Jan Vishwas Act. State Legal Metrology rules, later amendments and notifications change; verify the current position before acting.

Quick recapKey facts & short answers

Key Facts About Rules 3

  • Applies in: All states across India, under the relevant central law.
  • Mode: Mostly online via the official government portal.
  • Typical timeline: Ranges from a few days to a few weeks depending on the case.
  • Non-compliance: May attract penalties, interest or late fees.
  • Expert help: TaxClue completes the entire process end to end for you.

Which Schedule covers reference standards?

The First Schedule, with Part I for weights and Part II for the metre bar.

Do working standards include capacity measures?

Yes. Rule 5(5) and (6) refer to Part III of the Third Schedule.

Standards change by notification; check whether your product has been brought under a new order.

— TaxClue Product Compliance Desk

Rules 3: a key compliance topic in Indian tax and corporate law that businesses and individuals must understand to remain compliant.

Related Services & Guides

Was this article helpful?
About the author
11,561 articles
Vikas Sharma Verified expert Tax & Compliance Expert

Experienced in company registration, GST, trademark, and compliance. Helping Indian businesses stay compliant.

Last reviewed: Live

Disclaimer: This article is for general informational purposes only and does not constitute professional tax, legal or financial advice. Laws, rates and due dates change and can vary by individual case — always verify with the relevant government source (e.g. mca.gov.in, incometax.gov.in) or consult a qualified professional before acting. TaxClue accepts no liability for decisions taken based on this content.

People also ask

Questions, answered

Short, direct answers to the 6 questions readers ask most on this topic.

The First Schedule, with Part I for weights and Part II for the metre bar.

Yes. Rule 5(5) and (6) refer to Part III of the Third Schedule.

Rule 3 does not list one.

Yes, by notification under rule 6.

Section 9(3) of the Act says it is not a valid standard.

No. They amend the Act's penalty and procedure sections, not section 9 or these rules.