15 OCTPF & ESI · Contributions · Sep 2026tomorrow 20 OCTGSTR-3B · Summary return · Sep 2026in 6 days 21 OCTTax Audit Report · Form 3CA/3CB · AY 2026-27 · extended from 30 Sepin 7 days 30 OCTAOC-4 · Financial statements · FY 2025-26in 16 days 7 NOVTDS / TCS deposit · Deducted in Oct 2026in 24 days 11 NOVGSTR-1 · Outward supplies · Oct 2026in 28 days 21 NOVITR filing · Audit cases · AY 2026-27 · extended from 31 Octin 38 days 29 NOVMGT-7 / 7A · Annual return · FY 2025-26in 46 days
All due dates

Rules 22 and 23 of the Legal Metrology (Packaged Commodities) Rules, 2011: Maximum permissible error and deceptive packages

The maximum permissible error (MPE) is the shortfall in a package's net quantity that the Rules tolerate; it comes from the First Schedule (Table I for weight or volume, Table II...

Published
Updated
Reading time
8 min
Views
14
Questions
6 answered
  • Expert Reviewed
  • Medium Complexity
  • In-Depth Guide
Topic
Legal Metrology
Published
September 30, 2026
Last updated
Oct 13, 2026
Reading time
8 min
0:00
Last updated: October 2026Verified against: Government sources

Rule 22 says that the maximum permissible error for a commodity is the one set in the First Schedule, and lists what must be taken into account in setting it. Rule 23 deals with a package whose quantity is correct but whose design gives an exaggerated impression of quantity: it must be repacked and relabelled, or seized.

Rule 22: how the tolerance is set

Rule 22(1): the MPE for commodities "shall be such as is indicated in the First Schedule". Rule 2(e) defines MPE as "an error in deficiency which, subject to the provision of these rules, does not exceed the limits specified in the First Schedule". The word to notice is deficiency: the definition is about shortfall, not excess.

Rule 22(2): in establishing the MPE for net quantity, "due account shall be taken" of three causes of variation:

  • (a) unavoidable deviation in weighing, measuring or counting that may occur in good packaging practice;
  • (b) variations caused by ordinary and customary exposure to climate, transport, storage or the like in good distribution practice after the commodity enters trade; and
  • (c) variations due to the nature of the packaging material or container.

Rule 22(3): the Director, Controller or Legal Metrology Officer shall determine, or cause to be determined, for any commodity whose net quantity declaration is allowed to carry the words "when packed", the reasonable variations that may occur by reason of environmental conditions. This links to the dealer protection in rule 21. The rule does not list the commodities allowed the legend.

The error limits drive the tests in rule 19 and the section 36(2) offence in the Act, which punishes packing or importing with an error in net quantity "as may be prescribed". If you want a second pair of eyes on whether your pack sizes and tolerances work together, our legal consultation team can help.

First Schedule, Table I: weight or volume

Paragraph 1 of the First Schedule says the MPE, "in excess or in deficiency", in net quantity by weight or volume is as in Table I. Each row gives either a percentage of the declared quantity or a figure in g or ml.

Declared quantity (g or ml)MPE as % of declared quantityMPE in g or ml
Up to 509-
50 to 100-4.5
100 to 2004.5-
200 to 300-9
300 to 5003-
500 to 1000-15
1000 to 100001.5-
10000 to 15000-150
More than 150001.0-

The table, as scanned, is readable, and the percentage and gram figures match up at the band edges (for example 4.5 per cent of 100 is 4.5). The text does not say which band a quantity exactly at an edge such as 100 g belongs to.

Rounding (paragraph 1(2)). A percentage MPE is rounded to the nearest one-tenth of a g or ml for declared quantities of 1000 g or ml or less, and to the next whole g or ml for declared quantities above 1000 g or ml.

First Schedule, Table II: length, area or number

Paragraph 2 sets the MPE for net quantity declared in length, area or number of any commodity "not specified in the First Schedule" (the scan of this sentence is slightly unclear):

Declared inMPE
Length2% of declared quantity up to 10 metre and thereafter 1% of declared quantity
Area4% of declared quantity up to 10 sq. metre and thereafter 1% of declared quantity
Number2% of declared quantity

The Schedule, as printed in the consolidation, carries no commodity-wise lists beyond these two tables. The Seventh Schedule forms refer to "Schedule First/Second" and "Class A/B" for classification; the consolidation's First Schedule does not show a class-wise scheme, so check the gazette before relying on it.

How MPE works in an inspection

StepRuleUse of MPE
SamplingRule 19 and Fifth ScheduleMPE in grams found for the declared quantity
Lot approvalRule 19(6)Count of packages over MPE must not exceed column 4; none may exceed twice MPE
ActionRule 20Seizure if those limits fail
Shop testRule 21Deficiency "more than the maximum permissible error" leads to seizure from the dealer

Reading the table: a declared 250 g pack falls in "200 to 300", so the MPE is 9 g. A 1 kg pack sits at the edge of "500 to 1000" (15 g) and "1000 to 10000" (1.5 per cent); 1.5 per cent of 1000 g is also 15 g, so the edge question does not change the result there.

Rule 23: deceptive packages

Rule 23(1). If, on determining the quantity in sample packages, the officer finds that the quantity agrees with the declaration but "the package is a deceptive package", the officer must require the manufacturer or packer to repack and re-label the package. If the manufacturer or packer omits or fails to do so "in accordance with the standards established by or under these rules", the officer must seize the packages, take appropriate punitive action under the Act, and take adequate steps for safe custody until they are produced in court as evidence.

Explanation. A "deceptive package" is one "so designed as to deliberately given to the consumer an exaggerated or misleading impression as to the quantity of the commodity contained therein". The exception: bigger dimensions can be justified by the manufacturer or packer on the ground that such dimensions are necessary for protection of the commodity or for meeting the requirements of the machine used for filling the package.

Rule 23(2). If seized packages contain a commodity "subject to speedy or natural decay", the officer disposes of it "in accordance with the rules made under the Act".

Two points matter in practice. First, the rule is triggered even when the net quantity is correct: the offence is in the design. Second, the defence is on the manufacturer or packer to justify the dimensions, and the two grounds named are protection and machine filling. The text does not list other grounds, and "deliberately" in the Explanation makes intent part of the test. Packs declared in standard quantities are dealt with separately in rule 5.

Practical examples

Example 1. A 500 ml bottle is tested. The declared volume falls in "300 to 500", MPE 3% (15 ml). A sample bottle is short by 10 ml: within MPE. Another is short by 40 ml: that is above twice MPE (30 ml), which under rule 19(6) fails the lot regardless of the column 4 count.

Example 2. A cosmetic comes in a tall box with a thick cardboard insert, and the cream inside fills a fraction. If the packer cannot justify the dimensions on the two grounds in the Explanation, rule 23(1) requires repacking and relabelling, or seizure.

Need help with tolerances and pack design?

Tolerances, "when packed" legends and pack dimensions can all be tested by an officer. Our legal consultation service can review your pack sizes and labels against rules 22 and 23 and the First Schedule.

Key takeaways

  • MPE is an error in deficiency that does not exceed the limits in the First Schedule.
  • Table I covers weight and volume in nine bands; Table II covers length, area and number.
  • Percentage MPE is rounded to 0.1 g or ml up to 1000 g or ml, and to the next whole g or ml above it.
  • "When packed" variations are determined by the officer under rule 22(3).
  • A deceptive package with correct quantity must still be repacked and relabelled, unless its dimensions are justified by protection or machine filling.
  • Rules as amended up to March 2022; check later amendments.

Read next

Disclaimer: Based on the Legal Metrology (Packaged Commodities) Rules, 2011 (as amended up to March 2022; check later amendments), read with the Legal Metrology Act, 2009 (Act 1 of 2010), as on 30 September 2026. The Jan Vishwas (Amendment of Provisions) Act, 2023 (in force) and the Jan Vishwas (Amendment of Provisions) Act, 2026 (in force only from the date the Central Government notifies) amend the Act's penalty and procedure sections, not rules 22 and 23 or the First Schedule. State Legal Metrology rules, later amendments and notifications change; verify the current position before acting.

Quick recapKey facts & short answers

Key Facts About Rules 22 and 23

  • Applies in: All states across India, under the relevant central law.
  • Mode: Mostly online via the official government portal.
  • Typical timeline: Ranges from a few days to a few weeks depending on the case.
  • Non-compliance: May attract penalties, interest or late fees.
  • Expert help: TaxClue completes the entire process end to end for you.

What is the maximum permissible error for a 100 g pack?

Table I has a band of "50 to 100" with 4.5 g and a band of "100 to 200" with 4.5 per cent. Both give 4.5 g at 100 g.

Is the error limit about excess too?

The Table heading says "in excess or in deficiency", but rule 2(e) and the tests in rules 19 to 21 work on error in deficiency.

Claims on the pack must be ones you can prove.

— TaxClue Product Compliance Desk

Rules 22 and 23: a key compliance topic in Indian tax and corporate law that businesses and individuals must understand to remain compliant.

Related Services & Guides

Was this article helpful?
About the author
13,350 articles
Vikas Sharma Verified expert Tax & Compliance Expert

Experienced in company registration, GST, trademark, and compliance. Helping Indian businesses stay compliant.

Last reviewed: Live

Disclaimer: This article is for general informational purposes only and does not constitute professional tax, legal or financial advice. Laws, rates and due dates change and can vary by individual case — always verify with the relevant government source (e.g. mca.gov.in, incometax.gov.in) or consult a qualified professional before acting. TaxClue accepts no liability for decisions taken based on this content.

People also ask

Questions, answered

Short, direct answers to the 6 questions readers ask most on this topic.

Table I has a band of "50 to 100" with 4.5 g and a band of "100 to 200" with 4.5 per cent. Both give 4.5 g at 100 g.

The Table heading says "in excess or in deficiency", but rule 2(e) and the tests in rules 19 to 21 work on error in deficiency.

A package designed to deliberately give an exaggerated or misleading impression of quantity, unless the larger dimensions are justified for protection or machine filling.

Rule 23 still applies; the officer requires repacking and relabelling.

The Director, Controller or Legal Metrology Officer under rule 22(3).

No. They amend the Act's penalty sections; the rules here are unchanged by them.